Press 4
Stamping
- Parts/h · target
- 38 / 40
- Cycles
- 1,284
- Down this shift
- 0h 10m
Made this shift1,284 / 1,350
See what started, what stopped, and why.
Operators scan a QR sticker to say why a machine stopped. The machine, its PLC or a PC on the network sends a heartbeat with its status and counts. What Started turns both into a live board, alerts and OEE reports, per machine and per shift.
Free plan, no card needed. In English, Spanish and French.
Stamping
Made this shift1,284 / 1,350
Stamping
Tooling
Machining
Machining
No material
Operators scan it and tap why it stopped. No app, no account, buttons big enough for gloves. Works on any machine, however old.
Install the agent on a PC that can reach the PLC, or send pings from anything that can make a web request: Ignition, KEPServerEX, FactoryTalk Optix, Node-RED, a PLC gateway or your own code.
A live board and TV screens, an email when a machine stops or goes quiet, and OEE by machine, shift and day.
Install the agent on any Windows or Linux PC that can reach the machine, such as a line PC, an HMI PC or a Raspberry Pi, and pair it with a code. Out of the box it sends a heartbeat. Add a connection and it reads the machine's status, cycle count, bad parts and readings straight from the PLC, mapped on a setup page in the browser.
Map data · OPC UA
Press 4
| Field | Node id | Now |
|---|---|---|
| Status: Run when | ns=2;s=Line1.Press4.Running | true |
| Cycles | ns=2;s=Line1.Press4.Cycles | 1,284 |
| Bad parts | ns=2;s=Line1.Press4.Rejects | 7 |
| Part number | ns=2;s=Line1.Press4.PartNo | A-113 |
| oil_temp | ns=2;s=Line1.Press4.OilTemp | 41.8 |
Last heartbeat sent 0 s ago · 0 waiting
Reports · Yesterday · Line 1
| Machine | OEE | Made | Target | +/- time |
|---|---|---|---|---|
| Press 4 | 81.0% | 3,410 | 3,600 | −0h 25m |
| CNC-04 | 72.2% | 402 | 380 | +0h 28m |
| PRS-12 | 48.5% | 1,188 | 1,900 | −3h 01m |
Availability and downtime by reason on every plan. Pro adds performance, quality and OEE from cycle counts and scrap.
Build as many TV screens as you need, one for the press shop, one for the office, one for the shift meeting. Each screen is saved with its own setup.
Open the screen on any TV with a browser and leave it running. It updates as machines change.
Molding
PAGE 1 OF 2
DAY SHIFT
Mold change
Set up a plant, add a machine and print its QR code. It takes a few minutes.